Sign In | Join Free | My xuijs.com
China NANTONG HWATEK WIRES AND CABLE CO.,LTD. logo
NANTONG HWATEK WIRES AND CABLE CO.,LTD.
Verified Supplier

10 Years

Home > EV Charging Cable >

Custom Bare Copper Stranded EV Charging Cable with EVI-2 Insulation and EVM-1 Jacket for Electric Vehicles

NANTONG HWATEK WIRES AND CABLE CO.,LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Custom Bare Copper Stranded EV Charging Cable with EVI-2 Insulation and EVM-1 Jacket for Electric Vehicles

Brand Name : HWATEK

Model Number : Customize

Place of Origin : China

MOQ : 1000m

Price : To be negotiated

Payment Terms : T/T, L/C, Western Union,MoneyGram

Supply Ability : 100km per day

Delivery Time : 3-4 Weeks

Packaging Details : Packed in rolls or reels

Conductor : Bare Copper Stranded

Insulation : EVI-2

Jacket : EVM-1

Application : EV Charging Cable

Voltage : 450/750V AC

Temperature : -40-90℃

Packing : Packed in reels

HWATEK : HT2500226

Contact Now

Customize 5C×4mm2+1C×0.5mm2+W Bare copper stranded EV CABLE wIth EVI-2 Insulation EVM-1 Jacket

Construction
A:5C×4mm2B:1C×0.5mm2
ConductorBare copper stranded
Cross section4mm20.50mm2
Construction210/0.15mm+Tinsel+ Kevlar28/0.15mm+Tinsel+ Kevlar
Strand Dia.(Ref.)2.70mm1.15mm
InsulationEVI-2
Nom.Thickness0.70mm0.40mm
Min.Thickness0.53mm0.30mm
Insulation Dia.4.30±0.25mm2.00±0.10mm
Insulation colourA1.brown A2.blue A3.black A4.gray A5.yellow/greenB1.black
FillerPP rope
TapeNon woven
Assembly5C×4mm2+1C×0.5mm2+W
JacketEVM-1
Nom.Thickness1.30mm
Min.Thickness1.04mm
Outer Dia.15.40±0.50mm
Colourper request

Product Description
Application:EV Charging
Product character:
Tensile strength:≥20MPa Elongation:≥300%
Aged condition:110±1℃×168h
Percent of original tensile strength:±30%
Percent of original elongation: ±30%

Insulation:EVI-2
Conductor : Bare copper stranded
Construction
Insulation: A1.brown A2.blue A3.black A4.gray A5.yellow/green B1.black
Jacket Color : per request


Technical data
Rated voltage:450/750V AC
Rated Temperature: -40-90℃
Max.conductor DC resistance(20℃):A:4.95Ω/km B:39Ω/km
Dielectric Strength AC:2.5kV/5min

Properties
Effectively resist electromaganetic interference
Excellent insulation performance
Extensively Flame resistant
Flexible
Custom Bare Copper Stranded EV Charging Cable with EVI-2 Insulation and EVM-1 Jacket for Electric VehiclesCustom Bare Copper Stranded EV Charging Cable with EVI-2 Insulation and EVM-1 Jacket for Electric Vehicles

Custom Bare Copper Stranded EV Charging Cable with EVI-2 Insulation and EVM-1 Jacket for Electric Vehicles


Company Profiles
Founded in 2004 with 9 million USD capital investment, our HQ factory in Kunshan covers 14980 square meters.
In 2020 we established our Nantong facility with 100 million RMB capital investment which covers 34000 square meters.
With ISO9001, ISO14001, IATF16949, ISO13485 system certificates, all of our products have passed CCC, UL, CUL, CE, CSA, ETL safety certificates. We are working with global customers in various fields through our well-established sales system based on the management principal HONESTY, INNOVATION and ENVIRONMENTAL PROTECTION.

Certificates
Custom Bare Copper Stranded EV Charging Cable with EVI-2 Insulation and EVM-1 Jacket for Electric Vehicles
Production Progress
Custom Bare Copper Stranded EV Charging Cable with EVI-2 Insulation and EVM-1 Jacket for Electric Vehicles
Shipping
Custom Bare Copper Stranded EV Charging Cable with EVI-2 Insulation and EVM-1 Jacket for Electric Vehicles
FAQ
1. Q:What can you supply?
A: We do produce consumer electronics wires, hock up wires, industrial cables, robot cables, ev charging cables, new/green energy cables.
2. Q: What are the certificates do you get?
A: We have UL, CE, 3C, Dekra, CQC, TUV, Rohs, Reach, ETL certificates.
3. Q:Can we get samples before ordering?
A: Yes, we are willing to arrange samples for you.
4. Q: What's your lead time?
A: Normally we can finish you orders in 2-3 weeks, and 5-6 weeks in peak season.
5. Q. How can you guarantee the product quality?
A: Always a pre-production sample before mass production and final Inspection before shipment.
Major Customers
Custom Bare Copper Stranded EV Charging Cable with EVI-2 Insulation and EVM-1 Jacket for Electric Vehicles


Product Tags:

Bare Copper Stranded EV Charging Cable

      

EVI-2 Insulation Electric Vehicle Charging Cable

      

EVM-1 Jacket EV Power Cable

      
Best Custom Bare Copper Stranded EV Charging Cable with EVI-2 Insulation and EVM-1 Jacket for Electric Vehicles wholesale

Custom Bare Copper Stranded EV Charging Cable with EVI-2 Insulation and EVM-1 Jacket for Electric Vehicles Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: NANTONG HWATEK WIRES AND CABLE CO.,LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0